Design Record of Foundation Pit Inner Bracing System of Nanwei Station of Shijiazhuang Urban Rail Transit Line 2

WANG Chang-ke1,2,YANG Jin-lei 1,2,WU Wen-juan1,2,SUN Hui-zhe1,2,SONG Yang1,2,MENG Si-yu1,2   

  1. 1.Hebei Underground Space Engineering Geotechnical Technology Innovation Center,China North Industries NORENGEO Ltd,050011,Shijiazhuang,Hebei,China;
    2.Hebei Research Center of Geotechnical Engineering Technology,050031,Shijiazhuang,Hebei,China

  • Received:2019-11-28 Online:2020-03-31 Published:2020-04-30

石家庄市城市轨道交通2号线南位站明挖基坑内支撑支护设计实录

王长科1,2,杨金雷1,2,武文娟1,2,孙会哲1,2,宋 杨1,2,孟思宇1,2   

  1. 1.中国兵器工业北方勘察设计研究院有限公司,河北省石家庄市建设南大街45号 050011;
    2.河北省地下空间工程岩土技术创新中心,河北省石家庄市建设南大街45号 050011

  • 作者简介:王长科(1964-),男,河北邯郸市人,硕士,研究员级高级工程师,主要从事岩土工程、边坡工程方面的工作。E-mail:2262848156@qq.com
  • 基金资助:
    河北省建设科技研究计划项目(2017-139)

Abstract: In recent years,urban rail transit construction started in many cities,which has led to the emergence of super deep foundation pit and super large foundation pit.In Shijiazhuang area,the depth of subway foundation pits is generally between 15mand 25m,which are dangerous projects.In this paper,combined with the design of the supporting scheme of the deep foundation pit of Nanwei station of Shijiazhuang Metro Line 2,the design process is systematically introduced,and a reasonable construction scheme is put forward.The field monitoring data show that the design scheme is reasonable.

Key words: subway station, deep foundation pit, inner bracing system, deformation monitoring

摘要: 近年来,各地开始城市轨道交通建设,超深基坑、超大基坑层出不穷。在石家庄地区,地铁基坑的深度一般在15~25m之间,基坑深度较大,属于危险性较大工程。文中结合石家庄地铁2号线南位站深基坑工程支护方案设计,系统介绍设计过程,并提出合理的施工方案,通过现场监测数据表明设计方案合理。

关键词:  , 地铁车站, 深基坑, 内支撑, 变形监测