Taking the shield construction between Lu channel station and Shuanggang station of Tianjin Metro Line 6 as the background, the aim is to control the non-uniform settlement of the geological shield in water-rich sand layer through the building continuously. By using finite difference software is used for numerical simulation, this paper analyzes the non-uniform settlement force caused by shield tunneling through buildings, and provides theoretical guidance for the construction, analysis and determination of the building under the shield tunneling parameters of the accurate value range. Through the analysis of numerical simulation and actual monitoring data, the shield under the building will produce uneven settlement, but reasonable construction measures will not cause large damage to the building; In order to control the settlement and ensure the safety of the building, it is necessary to reinforce the weak parts of the building and the interval tunnel by grouting.