Journal of Hebei University of Water Resources and Electric Engineering ›› 2023, Vol. 33 ›› Issue (1): 73-78.DOI: 10.16046/j.cnki.issn2096-5680.2023.01.013

• Project Management Column • Previous Articles     Next Articles

Completion Acceptance Survey Practice of Multi-surveying Integration of Construction Project in Xiong'an New Area

ZHANG Yong1,2, WANG Chang-ke1,2, ZHAO Wei-ming1,2   

  1. 1. China North Industries Norengeo Co., Ltd., 050011, Shijiazhuang, Hebei, China;
    2. Hebei Underground Space Engineering Technology Research Center, 050011, Shijiazhuang, Hebei, China
  • Received:2022-07-17 Revised:2022-08-04 Published:2023-10-26

雄安新区工程建设项目“多测合一”竣工验收测量实践

张勇1,2, 王长科1,2, 赵炜明1,2   

  1. 1.中国兵器工业北方勘察设计研究院有限公司,河北省石家庄市建设南大街45号 050011;
    2.河北省地下空间工程岩土技术创新中心,河北省石家庄市建设南大街45号050011
  • 作者简介:张 勇(1989-),男,河北张家口人,硕士,工程师,注册测绘师,主要从事测绘与地理信息领域的研究。E-mail:1158373292@qq.com
  • 基金资助:
    石家庄市科技计划项目(221130134A)

Abstract: In order to share the valuable experience of the reform of multi-surveying integration of construction project in Xiong'an New Area, this paper mainly elaborates on each link of the reform practice of multi-surveying integration by taking Xiong'an New Area as an example. Many survey projects in the completion acceptance stage of Xiong'an New Area engineering construction project are entrusted to the same surveying and mapping unit to complete, so as to realize the multi-surveying integration. At present, the state and local governments have issued relevant policy documents on the multi-surveying integration of construction projects, but the overall situation is in the stage of exploration and experience summary. Combing and summarizing the practical experience of multi-surveying integration in Xiong'an New Area can be used as a reference in other provinces.

Key words: Xiong'an New Area, multi-surveying integration, completion acceptance, engineering practice

摘要: 为了分享雄安新区工程建设项目竣工验收阶段“多测合一”改革宝贵经验,通过以雄安新区为例,主要对“多测合一”改革实践各个环节进行详细阐述。雄安新区工程建设项目竣工验收阶段的多个测量项目均委托同一家测绘单位来完成,以此来实现“多测合一”。当前国家和各地方政府均出台了工程建设项目“多测合一”的相关政策文件,但总体处在摸索和总结经验阶段。雄安新区“多测合一”实践经验的梳理和归纳可供其他省份“多测合一”项目改革落地借鉴参考。

关键词: 雄安新区, “多测合一”, 竣工验收, 工程实践

CLC Number: