佛岩寺隧道陡峭大角度斜交进出洞施工技术

张国锋

  

  1. 中煤建工集团有限公司,北京市丰台区西局南街甲15号 100161
  • 收稿日期:2019-09-29 修回日期:2019-11-15 出版日期:2020-06-30 发布日期:2020-07-30
  • 作者简介:张国锋(1972-),男,河南固始人,高级工程师,从事地下工程及隧道施工。E-mail:467076378@qq.com
  • 基金资助:
    国家重点研发计划(2017YFC0805403);; 国家自然科学基金项目(41572276);; 中国煤炭地质总局科技项目(ZMKJ-2018-21)

Construction Technology of Steep Large-angle Oblique Entry-exit Tunnel of Foyansi Tunnel

ZHANG Guo-feng   

  1. China Coal Construction Group Co.,Ltd.,15Xiju Nan Street,Fengtai District,100161,Beijing,China
  • Received:2019-09-29 Revised:2019-11-15 Online:2020-06-30 Published:2020-07-30

摘要: 佛岩寺隧道为大角度斜交进出洞结构,洞口段坡体陡峭且分布有危岩体,洞口施工与沟底梯子峪特大桥施工交叉作业,施工场地狭小,进出洞施工安全风险较大。为防止边坡危岩坍塌事故,在交叉作业过渡区间设置安全防护措施,在洞顶施做主动防护网加固危岩体;左洞洞口地形与隧道洞身斜交角度大,在洞外施做半边护拱,从右洞通过车行横洞进入左洞,反向掘进小导洞出洞,然后按照三台阶七步开挖初步扩挖成型。通过施工检测数据可知,采用此方案后隧道位移最大值符合规范规定要求,效果显著。本次施工方案有效降低了交叉作业区域的安全风险,保障了洞口段施工的安全和质量。

关键词:  , 陡崖, 危岩体, 交叉作业, 斜交, 半边护拱, 小导洞

Abstract: Foyansi Tunnel is a large-angle oblique entry-exit tunnel structure with steep slope and dangerous rock mass.The location of the tunnel entrance crosses the Laziyu Bridge at the bottom of the ditch.The construction site is narrow and the construction safety risk is high.In order to prevent the collapse accident of dangerous rock slope,safety protection measures are set up in the transitional section of cross operation,and active protective net is applied to reinforce dangerous rock mass at the top of the cave.Considering the large angle of oblique intersection between the topography of the left tunnel entrance and the tunnel body,half arch protection is applied outside the tunnel,construction executed from the right tunnel to the left tunnel through the traveling cross-hole,the small guide tunnel is excavated backward,and then preliminary expansion is formed according to Three-bench Seven-step Excavation Method.According to the monitoring data of the construction process,the maximum displacement of tunnel is less than the specification.The effect is remarkable.The construction scheme effectively reduce the safety risk,the safety quality of construction is guaranteed.The paper provides reference for the similar construction difficult issues.